Germany installed 6.6 GW of onshore wind in 2024. What 2026 holds for installations, O&M demand

Updated 30 September 202614 min read
Quick answer: Germany added roughly 11 GW of new wind capacity in 2025, the strongest year since 2012, driven by the negative pricing of 2023 being over. For buyers the consequence is a repowering wave beginning now - the German fleet installed in 2005-2015 is reaching end of design life, and operators must replace roughly 1.2 GW per year over the next decade. That is the single most reliable pipeline of German O&M and turbine component demand in the sector.

Where Germany actually stands

Germany has oscillated between being Europe's most aggressive wind market and effectively closing itself off, with a policy cycle driven by the merit-order effect and the Federal Transmission System. The recent years make that pattern clear.

YearNew onshore capacity (GW)Driver
20215.8Strong year, EEG reform, recovery from 2020
20226.3Acceleration, permitting reform ("Osterpaket")
20236.6Growth, but the market produced severe negative power prices in some regions
20243.4Sharp fall. Negative prices and the end of the post-crisis price guarantee deterred investment
2025~11Recovery. Negative pricing largely over, faster permitting, strong corporate PPA demand
2026 (forecast)10 - 14Continued build-out, and the repurposing period begins in earnest

The installed base is the more important number for anyone supplying the sector. Germany has around 39-41 GW of onshore wind installed, roughly 24,000 turbines, built predominantly between 2005 and 2018. The installed base is a large and largely reliable O&M market, and it is ageing.

The repowering wave is the real commercial signal

Most of the German onshore fleet is 10-20 years old. A typical 2 MW turbine from 2006 is now beyond its design life, faces a substantially worse availability profile, and cannot compete on generation cost against a modern 4-6 MW machine on the same site.

1

What repowering removes and what it requires

Repowering replaces the turbine and typically reuses the foundation, the crane pad, the grid connection and the land agreement. It does not need new planning consent in the way a new site does, which is the decisive advantage - German permitting is the binding constraint on new capacity. That is why repowering will expand faster than new build in most scenarios.

2

The volume of it

Reasonable estimates put German repowering demand at roughly 1.2 to 2.0 GW per year from 2026 through the mid-2030s, subject to permitting reform and to how operators value the alternative of simply building new. That is on the order of 200-350 turbines per year, each requiring de-commissioning, civil work, a new turbine, grid reconnection and a new O&M contract.

3

What it means for suppliers

Each repowering removes a 2 MW turbine from the O&M pool and adds a 4-6 MW machine. For an O&M provider, that is a net loss of a familiar contract and a need to win a new one with a new provider. For a component supplier, it is a demand shift toward larger, heavier components with different failure modes. For a crane and heavy-lift company, it is volume. For anyone selling genuine availability and uptime to asset owners, the market is expanding as operators run fewer but larger machines with tighter availability guarantees.

The O&M market in numbers

SegmentMarket size indicationGrowth direction
Full-scope onshore O&MEUR 500m - 700m annually across the German fleetGrowing slowly in value, shrinking in turbine count
Repowering project managementEUR 400m+ cumulatively over the next decadeStrong growth
Major component exchange (gearboxes, generators, blades)EUR 300m - 500m annuallyStrong growth, and the highest-margin work in the sector
Remote monitoring and analyticsEUR 80m - 130mStrong growth, consolidating toward the OEMs
Offshore O&M (North Sea, Baltic)EUR 700m - 1.1bnStrong growth, driven by the 2030 targets and the Baltic build-out
Decommissioning and site remediationEmerging, EUR 100m+Growing from a small base, very long lead times

Who is winning turbine share

ManufacturerOnshore positionStrategy and note
EnerconGerman, strongly defended at homeDirect-drive, no gearbox. Trademarketed heavily and largely absent from the southern German market where competitors are entrenched. Strong political visibility
NordexStrong overall, gained via Delta WindGearbox and direct-drive platforms. Good value positioning in the mid-size segment
Siemens GamesaVery strong in onshore, plus the offshore franchiseThe broadest German onshore installed base and the reference for offshore. Corporate ownership has made some buyers cautious about long-term support
VestasStrong, but wind Germany is not its coreBest-in-class availability figures; the service argument is strong
SenvionReduced, now offshore and select onshoreHas exited much of its German onshore business
Nordex / Senvion rivals from ChinaMinimal in onshore GermanyGoldwind, Envision and MingYang have essentially no German onshore installed base, and German permitting and grid connection make entry slow

The constraint that decides the next three years

German onshore wind has an awkward structural problem: the country has the lowest average wind speeds in western Europe, which means higher LCOE than the North Sea or the Baltic, and the lowest electricity prices as a consequence. Any permitting reform that accelerates build-out therefore accelerates the cannibalisation of revenue per megawatt across the fleet. Operators are being squeezed from two directions at once.

Three policy variables will determine the shape of the next three years:

  • Permitting reform. Germany has implemented a permitting acceleration act and has moved to a "one-stop shop" model under a new permitting authority. Whether it changes throughput is the single biggest unknown.
  • Negative price thresholds. The rules permitting negative power prices have been tightened several times, which has improved project economics. The direction of travel matters more than the current level.
  • Grid connection and the hydrogen question. Grid connection queue reform is ongoing. A major green hydrogen build-out would create substantial additional offtake demand and change the whole commercial picture for developers.
For a supplier, the practical conclusion is that availability, grid compliance and repowering capability are the three areas where demand is structurally increasing, and turbine manufacturing itself is not. O&M revenue per turbine is falling while the number of turbines needing intervention is rising. The money moves to whoever can make an old machine behave like a new one.

What this means if you are buying from Germany

Wind component and service supply from Germany is genuinely deep. If you need:

  • Turbine spare parts - Enercon, Nordex, Siemens Gamesa and Vestas all maintain German-based parts operations, and the independent aftermarket is substantial.
  • Gearbox supply or overhaul - this is the highest-value and most constrained item in the sector, with a small number of capable European overhaulers.
  • Blade supply and repair - a genuine German specialism, including the repair of large blades in situ.
  • O&M contract covering a specific model - the providers holding OEM authorisation for your exact model are a short list, and that is a sourcing problem worth solving properly rather than a procurement exercise.

Tell us the turbine model, the component or the service you need, and we will identify the German suppliers who are genuinely capable, with current capability and lead time. Free for buyers.

Related reading

Frequently asked questions

How much wind capacity was installed in Germany in 2025?

Approximately 11 GW of new onshore wind was installed in 2025, which was Germany's strongest year since 2012. This followed a sharp fall to around 3.4 GW in 2024, driven by severe negative power prices in some bidding regions and the expiry of price guarantees. The 2025 recovery reflected the end of widespread negative pricing, faster permitting under the reform programme, and strong corporate power purchase agreement demand.

How many wind turbines are installed in Germany?

Germany has an installed base of roughly 39 to 41 GW of onshore wind across approximately 24,000 turbines, the majority built between 2005 and 2018. The total including offshore is higher. The installed base is ageing, and the large cohort installed in the mid-2000s is now at or beyond its 20-year design life, which is what drives the repowering pipeline.

What is wind turbine repowering and how much is planned?

Repowering replaces an ageing turbine with a modern, larger machine while reusing the existing foundation, crane pad, grid connection and land agreement. Because it avoids the permitting burden of a new site, it is expected to expand faster than new build. Estimates put German repowering demand at roughly 1.2 to 2.0 GW per year from 2026 through the mid-2030s, or 200 to 350 turbines annually.

Which turbine manufacturers have the largest German market share?

Enercon, Siemens Gamesa, Nordex and Vestas hold the large majority of the German onshore market, with Enercon particularly strong and trademarketed in northern and eastern Germany. Siemens Gamesa has the broadest overall installed base and the leading offshore franchise. Vestas competes principally on availability performance, and Senvion has withdrawn from much of the German onshore market. Chinese manufacturers have essentially no German onshore installed base.

How much does wind turbine O&M cost in Germany?

Full-scope onshore O&M runs approximately EUR 90,000 to 160,000 per turbine per year in 2026 for a modern machine, rising to EUR 210,000 for older small-hub turbines. Offshore contracts run EUR 320,000 to 650,000 per turbine per year because of vessel and crew access costs. Measured across the whole German fleet, the onshore O&M market is worth roughly EUR 500 to 700 million annually, with offshore at EUR 700 million to 1.1 billion.

More in this section