Germany Onshore Wind Energy Market Report 2026

Germany onshore wind market 2026: 62 GW installed, 10 GW pipeline.

Market Overview 2026

Germany onshore wind: 62 GW installed capacity (2025), 10 GW in permitting pipeline. Target: 115 GW by 2030. New installations 2025: 3.2 GW. Average turbine: 5.5 MW, 170m hub height.

Top Bundesländer by Capacity

1. Niedersachsen: 11.2 GW. 2. Schleswig-Holstein: 8.9 GW. 3. Brandenburg: 6.1 GW. 4. Nordrhein-Westfalen: 5.8 GW. 5. Sachsen-Anhalt: 4.2 GW. Bavaria: 2.1 GW (10H rule limits).

Turbine Manufacturers Market Share

Enercon: 42% (German OEM, E-175 EP5). Nordex: 28% (N163/6.X). Siemens Gamesa: 15% (SG 6.6-170). Vestas: 10% (V162-6.2 MW). Fuhrländer: 5% (MD77/82).

Permitting Timeline 2026

BImSchG permit: 12-18 months (reduced from 24+ months). Environmental impact: 6-12 months. Grid connection: 6-24 months. Total: 24-54 months. New Wind-an-Land-Gesetz: 2% land allocation mandatory.

Land Lease Rates

Lease rates: €40,000-80,000 per MW/year. Community benefit: €5,000-15,000 per MW/year. Property value impact: -5% to +3% (studies show neutral average).

Repowering Opportunities

1,200+ turbines >20 years old eligible for repowering. Potential: 8 GW additional capacity. Simplified permitting for repowering (6-12 months).

Grid Connection Costs

Grid connection: €50,000-200,000 per MW. Substation upgrade: €500,000-2M (if required). Redispatch costs: €0.02-0.05/kWh curtailment compensation.

Financing & LCOE

LCOE 2026: €45-65/MWh (onshore). PPA prices: €55-75/MWh (10-15 year contracts). Project finance: 70-80% debt, 20-30% equity. IRR target: 6-9%.