Siemens Gamesa Overview 2026

Siemens Gamesa Renewable Energy (SGRE) is a global wind turbine leader with 116 GW installed capacity worldwide. Headquartered in Hamburg, Germany, the company combines Siemens' offshore expertise with Gamesa's onshore heritage, serving 90+ countries.

116 GW
Global Installed Capacity
32,000+
Turbines Installed
18 MW
Largest Offshore Model
97%
Turbine Availability

Onshore Turbine Portfolio

ModelCapacityRotor DiameterHub HeightBest For
SG 3.4-1323.4 MW132m100-140mLow-wind sites (5.5-6.5 m/s)
SG 5.0-1455.0 MW145m120-160mMedium-wind sites (6.5-7.5 m/s)
SG 6.6-1706.6 MW170m140-180mHigh-wind sites (7.5+ m/s)
SG 5.8-1585.8 MW158m125-165mRepowering projects

Offshore Turbine Portfolio

ModelCapacityRotor DiameterSpecific PowerInstallation Status
SG 11-200 DD11 MW200m350 W/m²Commercial (2022+)
SG 14-222 DD14-15 MW222m320 W/m²Commercial (2024+)
SG 18-228 DD18 MW228m300 W/m²First installation 2026
SG 10.0-19310 MW193m340 W/m²Geared option available
2026 Innovation: The SG 18-228 DD is the world's most powerful wind turbine, generating enough electricity to power 20,000 European households. Each rotation produces 50 kWh of energy.

German Manufacturing Facilities

  • Hamburg: Nacelle assembly, R&D headquarters, offshore blade production (up to 107m)
  • Cuxhaven: Offshore nacelle manufacturing, port logistics hub
  • Lemförde: Gearbox production for geared turbine models
  • Rostock: Service center for Baltic Sea offshore farms

Service & Maintenance Network

Service LevelResponse TimeCoverageAnnual Cost (% of CapEx)
Basic (Remote)4h remoteSCADA monitoring, troubleshooting1.5-2.0%
Standard (On-site)48h on-site2 PM visits/year, spare parts2.5-3.0%
Premium (Full)24h on-siteUnlimited parts+labor, 4 PM visits3.5-4.5%
Availability Guarantee12h emergency97% availability guarantee5.0-6.0%

Frequently Asked Questions

What is the lead time for Siemens Gamesa turbines?

Onshore turbines: 12-18 months from order to commissioning. Offshore turbines: 18-30 months (includes foundation coordination, vessel availability). 2026 backlog: ~25 GW, with 60% allocated to European projects.

What is the cost per MW for Siemens Gamesa turbines?

Onshore (2026): €950,000-1,150,000 per MW (turbine only). Offshore: €1,400,000-1,800,000 per MW (turbine only). Full turnkey (including foundation, installation, grid): €1,800,000-2,500,000 per MW onshore, €3,500,000-5,000,000 per MW offshore.

How does direct-drive compare to geared turbines?

Direct-drive (DD): No gearbox, lower maintenance, higher reliability (97%+ availability), but heavier nacelle and higher initial cost. Geared: Lighter nacelle, lower CapEx, but gearbox requires maintenance and has higher failure rate. SG offshore turbines use direct-drive; onshore offers both options.

Need Wind Turbine Components?

German Industry Hub connects wind farm developers with verified German wind turbine manufacturers and component suppliers. We handle supplier identification, contract negotiation, and logistics coordination.

Email: info@germanindustryhub.com

Request Supplier Shortlist
AS

Arshiya Sabaghi, German Industry Hub

Industrial sourcing specialist with MSc in Sales Management. Experience at McKinsey & Company (Industrial AI), Rolls-Royce Motor Cars, and AkzoNobel. Based in Amsterdam.

German Aerospace Precision Engineering 2026Laser Cutter Germany Manufacturers 2026